Mark scheme

Examiner's comment
These questions assess knowledge and understanding and require students to outline key processes, concepts, interaction and change. Four-mark questions performed well, provided the students had the appropriate level of understanding of the specification content. 4-mark questions are point marked. A mark may be awarded where a student makes a single relevant point and subsequent marks awarded (if applicable) where the student develops those points with additional knowledge. Question 01.1 was well answered, with students generally having a really secure understanding the characteristics of the drainage basin. Question 01.1 (AO1) (4 marks) was generally well done by students. Examiners allowed a multitude of approaches including a more systems-based approach as well as outlining features and characteristics. It was pleasing to note just how many students made relevant points about these features. ‘Max’ is used when the student could score more marks but has reached the maximum available. This response took a systems approach and scored rapidly. 4 marks
Notes from the mark scheme and report
- point marked with marks for developed points (d)
- area drained by a river and tributaries, watershed boundary, rock permeability, slope, vegetation, land use, drainage patterns (dendritic, trellis)
- a systems approach was also credited
- well answered